This project involves enlargement of an existing detention basin from a capacity of 18ML to 37ML along with installation of 3 large gross pollutant traps at the eastern side of the site and a concrete channel along the northern Greenhill Road frontage. These works aim to limit flow to the existing capacity of the culvert under the Fullarton and Greenhill Roads intersection. Together with the South Park Lands works, this project will help manage flooding from Park Lands Creek and within downstream residential areas.

The Glenside site is being developed by Cedar Woods and works being delivered by Cedar Woods include provision of the flood mitigation infrastructure.

The Glenside project works are outlined in Section 10.2 of the 2016 Stormwater Management Plan.